MCP servers › io.github.HorizunGroup › horizun-msproject-mcp
MCP server · registry snapshot 2026-10-04
io.github.HorizunGroup/horizun-msproject-mcp
Audit, reschedule and author Microsoft Project schedules. No Java, no Project install. — the publisher's description
Summary
io.github.HorizunGroup/horizun-msproject-mcp is a local MCP server listed in the official MCP registry at version 1.6.0. We have not tested it. Its package type is not run in our sandbox yet. This is our limit, not the server's.
Key facts
- Runs
- local package
- Transport
- standard input/output
- Package
- NuGet
- Repository
- public
- Topic
- productivity-and-docsAI-classified
- Last tested
- not tested
How fresh this is
- Live-tested
- no
- Last tested
- not tested
- Registry data
- snapshot 2026-10-04
- Package and repository
- checked 2026-10-06
Security testing
Has it been tested?
Feature #1Its package type is not run in our sandbox yet. This is our limit, not the server's.
Package type: nuget.
What it is
Does the registry listing match what we found?
Feature #6The registry verifies a package once, when it is published, and does not re-check it. A difference below is about the listing, not a judgement of the publisher.
| Registry says | We found | Result | Source · date |
|---|---|---|---|
| Repository github.com/HorizunGroup/horizun-msproject-mcp | Opens publicly | matches | api.github.com · 2026-10-06 |
Who made it?
Feature #7 · lineage
Facts about the publisher. We do not turn them into a trust score.
- Namespace
- io.github.HorizunGroup
- GitHub owner
- an organization (HorizunGroup)
- Repository
- github.com/HorizunGroup/horizun-msproject-mcp
- Stars
- 4
- Repository age
- 31–90 days
- Last push
- 0–30 days ago
- Archived
- no
Source: the registry entry and api.github.com · 2026-10-06.
Choosing
Common questions about io.github.HorizunGroup/horizun-msproject-mcp
Answered from the data aboveHas io.github.HorizunGroup/horizun-msproject-mcp been security tested?
Not yet. Its package type is not run in our sandbox yet. This is our limit, not the server's.
Where is the source code of io.github.HorizunGroup/horizun-msproject-mcp?
In github.com/HorizunGroup/horizun-msproject-mcp, which opens publicly.
Reference
How is it classified?
18 fields
One value per field, each with its source. Fields written by AI models are marked. A field with no value says why.
“Not stated” means the source did not state it; “does not apply” means it does not apply to this kind of server; “our limit” means our own lookup failed.
Cite or correct this page
Sources and corrections
Suggested citation
ProtocolProbe. “io.github.HorizunGroup/horizun-msproject-mcp: MCP server record.” Data checked 2026-10-06. https://protocolprobe.com/mcp/servers/io.github.HorizunGroup/horizun-msproject-mcp
Figures are valid for the date shown. Our facts on this page are CC BY 4.0: reuse them with a link and the check date. Quoted text (the publisher’s descriptions, website quotes, tool names) is not ours to license.
As JSON: this record in the API · API documentation.
Something wrong, or is this yours?
If a fact here is wrong, tell us and we will re-check it. If you operate this server, you can authorize a full test.
Write to hello@protocolprobe.com · corrections log · methodology